IBCS Gate Check

By Debbie Siegelbaum / April 26, 2010 at 5:00 AM

The Army’s Integrated Battle Command System is ready to enter the design phase, after contractor Northrop Grumman announced the successful completion of an Interim Design Review for the program.

In an April 26 press release, Northrop said the three-day review, concluded on March 25, was the first in a series of events leading up to the Army's Delta-Preliminary Design Review slated for later this year.

According to the release, the IBCS program -- which uses an open-architecture and can be tailored for different missions using a battle command system for air and missile defense -- will utilize an integrated fire control network, significantly enhancing joint Integrated Air and Missile Defense operations.

The Army awarded Northrop a $577 million, five-year design and development contract in December 2009 to develop IBCS.

59535